Important: This article is general information for education only. It does not recommend any project or builder, and it is not legal advice. Rules vary by state; verify project details, certificates and complaints on your state RERA portal and check local municipal requirements.


For many IT professionals, the possession letter arrives years after booking: you may have changed jobs twice, moved cities for a project, or be on onsite deputation when the builder finally calls. The temptation is to collect the keys on a Saturday, sign whatever is put in front of you and move in before the next sprint starts. That is exactly when costly problems get locked in: a missing occupancy certificate, a seepage problem you “accepted” by signing, or maintenance charges you never agreed to.

The Real Estate (Regulation and Development) Act, 2016 (RERA) sets out what the builder (the “promoter”) must do at this stage and what you, the allottee, must do in return. This guide walks through the sequence, the money you will be asked for, the inspection and the papers to collect, so the handover is a checklist rather than a gamble.

The occupancy certificate comes first

Under Section 11(4)(b) of RERA, the promoter is responsible for obtaining the completion certificate or occupancy certificate (OC), or both, as applicable. The OC is issued by the local planning or municipal authority and confirms the building can be legally occupied. Names differ by state and city, and some places issue a completion certificate (CC) separately or a partial OC for specific towers.

Why it matters to you:

  • Without an OC, permanent water, sewage and electricity connections may be difficult, and occupation may be treated as unauthorised by the local body.
  • Lenders usually want to see the OC before treating the property as complete, and resale buyers will ask for it later.
  • RERA’s possession timelines run from the OC, so its date is the reference point for many of your rights and duties.

Ask for a copy of the OC that covers your tower and floor, and cross-check that it is uploaded against the project on your state RERA portal. If the builder offers “fit-out possession” or keys without an OC, understand that this is not the same as legal possession under the Act.

Key RERA timelines at handover

ProvisionWhoWhat it says (in brief)
Section 19(10)AllotteeTake physical possession within two months of the occupancy certificate
Section 17(1)PromoterExecute a registered conveyance deed and hand over possession; where no local law applies, within three months of the OC
Section 17(2)PromoterHand over documents and plans, including of common areas, to the association; where no local law applies, within thirty days of the OC
Section 11(4)(d)PromoterProvide and maintain essential services on reasonable charges until the association takes over
Section 14(3)PromoterFix structural defects or defects in workmanship, quality or services reported within five years of possession, free of charge, within thirty days
Section 19(6) and 19(7)AllotteePay dues, registration charges, taxes, utility and maintenance charges as agreed; interest is payable on delay

Where a state law or the state RERA rules set different timelines or procedures, those apply, so check your state’s rules and your agreement for sale.

Read the possession letter and final demand carefully

The offer of possession usually comes with a final demand. Before paying, compare every line with your registered agreement for sale. Typical items include:

  • The last instalment of the sale price.
  • Advance maintenance for a fixed number of months.
  • A corpus or sinking fund for the future association.
  • Deposits for electricity and water connections or meters.
  • Charges for parking, club membership or legal documentation, if the agreement provides for them.
  • Stamp duty and registration fees for the sale or conveyance deed, if not already paid.

Charges that are not in the agreement need a written explanation. Ask how GST has been applied: as a general principle, GST applies to under-construction instalments but not to the sale of a completed flat after the completion certificate is issued, so the timing of the OC and your payments matters. Get the builder’s calculation in writing and check it with a tax professional if the amounts are large. Also remember that your TDS obligation on property purchases applies to the final instalment, as it did to earlier ones; our first-flat legal checklist explains property TDS and stamp duty.

Worked example: what the final demand adds up to

Rahul and Meera Iyer, both software engineers in Hyderabad, booked a 1,250 sq ft (super built-up) flat for ₹85,00,000. The possession letter asked for:

ItemBasisAmount
Final instalment5% of ₹85,00,000₹4,25,000
Advance maintenance₹4.50 per sq ft × 1,250 sq ft × 24 months₹1,35,000
Corpus fundFixed, per agreement₹1,00,000
Electricity deposit and meterAs per builder₹30,000
Total₹6,90,000

Monthly maintenance works out to ₹4.50 × 1,250 = ₹5,625, and 24 months of it is ₹1,35,000. When the couple checked their agreement, it allowed only 12 months of advance maintenance. They asked for a revised demand: ₹5,625 × 12 = ₹67,500, which reduced the total by ₹67,500 to ₹6,22,500. They also asked for the electricity deposit receipt to be issued in their names so it could be transferred to the association later.

The snag inspection: do it before you sign

Many possession forms include a line saying you have inspected the flat and are “fully satisfied”. Your five-year right under Section 14(3) still exists, but a clean, documented snag list at handover avoids arguments about whether a defect existed earlier. Schedule a weekday visit in daylight if you can, and consider a paid professional inspection if you are not confident.

  1. Measure. Check the carpet area against the agreement with a laser measure, room by room.
  2. Walls and ceilings. Look for cracks, hollow-sounding plaster, damp patches and uneven paint, especially near bathrooms and external walls.
  3. Water. Run every tap and shower, flush every toilet, fill the floor near drains and check that water flows away. Check under sinks for leaks.
  4. Electricals. Test every switch and socket with a phone charger or tester, check the distribution board labelling and earthing, and confirm the sanctioned load.
  5. Doors and windows. Open and lock each one, check alignment, glass, sealing and the main door lock.
  6. Flooring and tiles. Tap tiles for hollow sounds, look for chips and check the slope in balconies and wet areas.
  7. Specifications. Compare brands and fittings against the specification schedule in your agreement.
  8. Common areas. Check lifts, fire safety equipment, power backup, parking allotment and access roads promised in the plan.

Photograph everything with timestamps, write the list up, get the builder’s representative to sign and date it, and agree a date for fixes. If you sign the possession form before all items are fixed, add “subject to rectification of attached snag list” next to your signature.

Documents to collect at handover

  • Copy of the occupancy certificate and completion certificate (as applicable).
  • Possession letter stating the date of handover (this starts the five-year defect period).
  • Registered sale deed or conveyance deed, or a written timeline for its execution.
  • Receipts for every payment, and a “no dues” letter from the builder.
  • If you have a home loan, a statement of disbursement and the lender’s acknowledgement of the original documents it holds.
  • Approved building plan and the flat’s floor plan, including electrical and plumbing layouts.
  • Warranty cards and manuals for fittings, lifts (for the association) and any appliances supplied.
  • Parking allotment letter, if parking was part of the deal.
  • Electricity and water connection papers, and any NOCs the builder obtained.

After registration, apply to the local body for property tax assessment and mutation (called khata, patta or other names depending on the state) in your name. The process and documents differ by municipality.

The residents’ association and common areas

Section 11(4)(e) requires the promoter to enable the formation of an association or society of allottees. Until the association takes over, the promoter must maintain essential services on reasonable charges. Section 17 then requires the common areas and the related documents and plans to be handed over to the association within the time set by local law, or by the default timelines in the Act.

Join the association early. Busy tech professionals often leave this to retirees in the building, but the handover of the corpus fund, maintenance accounts, lift and fire-safety contracts and common-area defects is where significant money is at stake. Section 19(11) also expects every allottee to take part in registering the conveyance deed.

Defects after you move in: the five-year rule

If you notice a structural defect or a defect in workmanship, quality or services within five years of the handover date, Section 14(3) says the promoter must fix it free of charge within thirty days of being told. If it doesn’t, you can seek compensation under the Act. In practice:

  1. Report the defect to the builder in writing (email works), with photos and the date you noticed it.
  2. Keep a record of the thirty-day window and any visits or partial repairs.
  3. If it is not fixed, file a complaint on your state RERA portal, attaching the possession letter, photos and correspondence.
  4. For defects in common areas, act through the association so the complaint represents all affected owners.

Damage you cause through your own interior work, such as breaking a waterproofed bathroom floor, is unlikely to be the builder’s responsibility, so photograph the flat before your interior designer starts.

If you are onsite or in another city

Because Section 19(10) expects possession within two months of the OC, an onsite stint can create pressure. Options include asking the builder in writing for a short extension, taking possession through a family member or a trusted representative authorised by a properly executed power of attorney, and doing the snag inspection on a video call with someone present. Registration of documents may need your physical presence or a registered power of attorney, depending on state practice. Our guide on managing property in India while on onsite deputation explains power of attorney basics.

Common mistakes

  • Taking keys without seeing an OC for your tower.
  • Paying a final demand without matching it line by line with the agreement for sale.
  • Signing a “fully satisfied” declaration without attaching a snag list.
  • Losing track of the possession date, which is when the five-year defect period starts.
  • Delaying the sale or conveyance deed and mutation, which causes trouble with resale, loans and property tax later.
  • Ignoring the association until the builder has already handed over accounts and contracts.

Frequently asked questions

Can the builder charge me maintenance before I take possession?
Section 19(6) makes you liable for maintenance and other charges as provided in your agreement, and Section 19(10) expects you to take possession within two months of the OC. Many agreements start maintenance from the date possession is offered, even if you collect the keys later. Check your agreement and your state’s rules, and challenge charges that start before a valid OC.

Does signing the possession letter end my right to complain about defects?
The five-year defect liability in Section 14(3) runs from the date of handing over possession, so signing does not by itself extinguish it. A documented snag list at handover still helps avoid disputes.

What if possession is late?
Delay in possession is a separate issue with its own remedies of interest, refund or compensation. See our guide on RERA rights when possession is delayed.

Sources


Last reviewed: 3 November 2026. This article is general information, not legal advice, and does not recommend any project or builder. Verify project details and timelines on your state RERA portal and with your local authority.